Conair Hopper Temperature Controller UGD031 Manuale Utente Pagina 60

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 59
Normal Operation To Start Heating
1 Determine what the HTC’s setpoint must be for your process and material.
2 Make sure there is material in the hopper.
3 Start the dryer or process blower to begin air flow. Set the proper flow on
the blower if equipped.
4 Turn on the main power to the HTC. Make sure the HTC’s disconnect dial
is in the ON position. This powers up the control and the display lights will
illuminate.
5 Set the drying temperature. Press the Adjust Setpoint or t buttons to
select the temperature.
7 T
ur
n the heater switch to “Enable” to start heating.
ON
O OFF
Heaters
Startup /
Shutdown
For Startup:
1. With heaters in
Standby, turn on
blower or dryer.
2. Enable heaters.
For Shutdown:
1. Switch heaters to
Standby. 
2. Wait 60 seconds
before turning off
blower or dryer.
Enable
Standby
Setpoint Adjust
Buttons
4-24 l Operation
Vedere la pagina 59
1 2 ... 55 56 57 58 59 60 61 62 63 64 65 ... 96 97

Commenti su questo manuale

Nessun commento